• Operation and maintenance of the Power plant:

  • SINT have been awarded a contract from Al-Gubra Power Plant for supplying the Electrical, Mechanical & Instruments Engineers, Electrical, Mechanical & Instruments Technicians and civil Labors for two years (Jan. 2013 till Jan 2015) to maintain and operate the power plant under supervisory of GPDCO engineers. SINT had almost 30 staff involve in this project.
  • SINT have been awarded a contract to supply the Omani electrical and mechanical technician to operate and maintain the Wadi Al-jizzi power plant. This contract was started from 2013 and ended on 2019. We had supplied almost 15-20 technician and admin Clark within this period.

• Major Overhauling for the power plant.

  • SINT have been awarded a contract from Al-Gubra Power Plant for supplying the Electrical, Mechanical & Instruments Engineers, Electrical, Mechanical & Instruments Technicians and civil Labors for two years (Jan. 2013 till Jan 2015) to maintain and operate the power plant under supervisory of GPDCO engineers. SINT had almost 30 staff involve in this project.

• Fuel Monitoring solution

  • SINT have been completed two projects with TANWEER (RAECO) for fuel monitoring, client wanted to monitor the fuel consumption of each engine, so we had installed the Ultrasonic Flowmeter, with monitoring and SCADA system. This system allow client to check the fuel consumption. This system was installed in 5MW and above Diesel Generators.

• Supply and installation of RO plant, Chlorination, STP and related equipment

  • SINT with her engineers and Japanese and European principles are executing the EPC projects. We have completed Thermal desalination plant for process water, Reverse Osmosis plant, Gas Chlorination plant and etc.