Main Component

 

45 lit/s Pumps @128m (1+1+1) with VFD
Surge Vessels – 9m3 with compressor and 4.5m3 vented surge vessel.
Supply and laying DN300mm, DI pipe PN16
Construction of
* 432m3 RCC tank
* Pump room with crane
* Operation room
* Boundary wall
* 600mm Boring in 5 places, asphalt cutting, wadies, OGC & PDO pipeline crossing and etc.
* Washout 4 Nos. Air Valve 19 Nos., Gate Valve 6 Nos.,
Main mechanical items: Solenoid Valve 2 Nos., Electro-magnetic flow meter.
Instrument: SCADA system, Integration at Nizwa, Adam & Al-Khude MPS.
Electrical & Fire: complete electrical work for entire building including, FP, MFP, Lighting, earthing, LCP and Fire alarm and faithing system.