Main Component

 

Supply and laying 7.4km DN225mm HDPE PN16
Supply and installation of Pressure Reducing Valve (PRV), Gate Valves, FH, Washout, Electromagnetic Flow meters and etc.
SCADA and transferring the data to PAW,
Horizontal Directional Drilling in 5 roads and one main road of Ibri – Buraimi.