Water & Sewage connection for Jeser Building at Safe – Al Khoudh

About This Project

brief scope of work :

There were two new building and the project was to supply the water from MAM and transfer the Sewage to MAM STP.
The scope was, laying 250mm HDPE for water and sewage, building the Mini and main lifting station including the pumps. Installing the intermediate GRP tanks (2 x 400m3), pumps as booster pump for each building and main pumps and etc. Fire system and installing the fire pumps.

 

main component :

Mechanical equipment’s:
2 x 400m3 GRP water tanks
Main Centrifugal pumps to shift the water to GRP tanks from MAM.
2 set of Booster pumps to deliver the water from GRP tanks to building tanks.
Fire Fighting pump set (Diesel, Electrical & Juki)
9 set of Sewage pumps in Mini and main lifting stations.
DN250, 160, 110mm HDPE for potable water, Fire fighting and Sewage system.
Electrical and instrumentation: All the control panels for the pumps, cabling and earthing system.
Construction:
Construction of pump room, GRP tanks foundations, Sewage lifting stations, gate, washout, Solenoid & Air valve chambers.
HDD work, wadi crossing, and road crossing

Project Name :

Water & Sewage connection for Jeser Building at Safe - Al Khoudh