Rehabilitation of 300m Distribution Pipe at Wilayat Muscat (Governorate of Muscat)
Shutdown and DN 400, 300mm Pipeline - Pic1
Shutdown and DN 400, 300mm Pipeline - Pic2
Shutdown and DN 400, 300mm Pipeline - Pic3
Shutdown and DN 400, 300mm Pipeline - Pic4
Shutdown and DN 400, 300mm Pipeline - Pic5
Shutdown and DN 400, 300mm Pipeline - Pic6
Shutdown and DN 400, 300mm Pipeline - Pic7
Shutdown and DN 400, 300mm Pipeline - Pic8
Shutdown and DN 400, 300mm Pipeline - Pic9
Shutdown and DN 400, 300mm Pipeline - Pic10
Shutdown and DN 400, 300mm Pipeline - Pic11
Shutdown and DN 400, 300mm Pipeline - Pic4
About This Project
– Scope of the Contractor
Rehabilitation work: Supply, laying & replacing the DN400 & 300mm Restrained DI pipe with existing DI pipe and connection to existing 600mm and 300mm DI pipe and DMA at Riyam Road in Muttrah.
The project is including the installation of buried gate valve, Air valves, FH and pipe is going parallel to the Asphalt and interlock including giving connection to the existing road and houses.
– Project Main Components
DN400mm Restrained DI pipe
DN300mm Restrained DI pipe
DN100mm DI pipe as variation
2200m Asphalt cutting and 1000m Interlock removal
Project Name :
Shutdown and DN 400, 300mm Pipeline – PAW- Muttrah